Reduction of Changeover Time by Using the SMED Technique with the Assistance of Lean Manufacturing Tools in a Plastic Company

Author Affiliations
Dhaka University of Engineering & Technology
Year2023

Abstract

The expanding manufacturing sector of plastic items is coming about because of the injection molding process and the quick advancement of existing innovation. One of the most time-consuming, non-value-added tasks in a manufacturing process is setup, or changeover. The study was conducted at a plastic product manufacturing company in Bangladesh. This study's goal was to demonstrate how changeover time reduction approaches may be used in a medium-sized production facility to cut down on total process lead time with the assistance of lean manufacturing tools. The analysis of numerous factors, including non-conformities, complaints, and delivery delays, revealed improvement prospects. In this research, three cases were considered for reducing overall changeover time: one is Reduce 7 Wastes (Case 1), the second is…
View at Publisher

BORR does not host full-text PDFs. The button above takes you to the original publisher.